01
Slurry preparation and dosing
Cement, fibre and water are mixed to a controlled consistency before anything can be formed from it, and the mix is abrasive from the moment it leaves the mixer. Level in the vats, and the flow of water and additive into them, are the measurements; the final control elements are pumps, agitators and dosing valves that all wear. Instruments here are chosen as much for where they can be mounted — out of the slurry, out of the splash — as for what they measure.